Construction progress Porta Nova: Screening and chalking
Furthermore, small wooden stakes have been put in place for the technical area and the roof of the greenhouse has been chalked. Inside, the first excavations works started and soon the digging of the basins will begin. The drone images give a good overview of the progress of the project.
A quick view from inside the greenhouse
The greenhouse is being chalked.
Porta Nova from above
For more information:
Havecon Kassenbouw B.V.
Marconistraat 32
2665 JE Bleiswijk
Postbus 25
2665 ZG Bleiswijk
Netherlands
Tel. +31(0)10 266 32 70
Fax +31(0)10 266 32 71
info@havecon.com
www.havecon.com