Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

You are using software which is blocking our advertisements (adblocker).

As we provide the news for free, we are relying on revenues from our banners. So please disable your adblocker and reload the page to continue using this site.
Thanks!

Click here for a guide on disabling your adblocker.

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

Improving snapdragon production through high tunnel season extension, transplant timing, cultivar selection

The demand for locally grown, specialty cut flowers is increasing and now includes nontraditional regions for production, such as the U.S. Intermountain West. The objective of this study was to evaluate snapdragon (Antirrhinum majus L.) as a cool season, cut flower crop in northern Utah, where the high elevation and semiarid climate result in a short growing season with strong daily temperature fluctuations.

High tunnel and field production methods were trialed in North Logan, UT (41.77°N, 111.81°W, 1382 m elevation) with cultivars ‘Chantilly’, ‘Potomac’, and ‘Rocket’ in 2018 and 2019. Each year, five to six transplant timings at 3-week intervals were tested, beginning in early February in high tunnels and ending in late May in an unprotected field. Stems were harvested and graded according to quality and stem length.

High tunnels advanced production by 5 to 8 weeks, whereas field harvests continued beyond the high tunnel harvests by 2 to 8 weeks. High tunnels yielded 103 to 110 total stems per m ² (65% to 89% marketability), whereas field yields were 111 to 162 total stems per m ² (34% to 58% marketability). Overall, production was the greatest with March transplant timings in the high tunnels and mid-April transplant timings in the field. ‘Chantilly’ consistently bloomed the earliest on 4 and 6 May each year, ‘Potomac’ had the highest percentage of long stem lengths, and ‘Rocket’ extended marketable stem production through July in high tunnels. Selecting optimal transplant dates in the high tunnel and field based on cultivar bloom timing maximizes marketable yields and results in a harvest window lasting 4.5 months.

The study was conducted by Maegen Lewis, Melanie Stock, Brent Black, and Dan Drost. 

To read the complete study, go to www.researchgate.net.

Publication date: