With a team of no fewer than 50 colleagues, Optiflor recently helped install the cover on the new water basin at its construction site on Waellandweg in Monster.
After the groundwork by Kroes Aannemingsbedrijf and the specialists at Albers Alligator, it was Optiflor's turn to flex some muscle. Thanks to the joint effort, the basin is already up and running. Now it's just a matter of waiting for the rain to fill it up!